2015 Jun - Flood Alleviation defences take shape in Somerset Aspin Group Civil Engineering
June 17, 2015

2015 Jun - Flood Alleviation defences take shape in Somerset

Major works to help reduce flooding on the Somerset Levels are continuing to progress with four huge concrete culverts now in place. 

The culverts, which are part of the second phase of works at Beer Wall, each measure an impressive 2 metres tall by 3 metres wide and will allow any future flood water to pass under the A372.

Read more