M6 Toll Bridge Assessments

Project Overview

Due to excessive deflections of the bridge deck; causing deterioration of the road and discomfort for drivers, we were asked to independently verify the strengthening works proposed by Freyssinet. We produced a 3D analysis model of the three-span steel concrete composite bridge, which alongside our calculations, allowed us to reach a consensus with the designers on this strengthening proposal. The successful completion of this package of work led our client, M6 Toll, to extend our work to three bridges in total.

Services Provided

  • Civil Engineering
  • Structural Engineering