Train Platform Extension at Bedford Station

Project Overview

A tight programme and buried services dictated that traditional methods of railway platform construction were not practicable for this extension. We therefore proposed our bespoke modular platform system which can be easily installed by road-rail vehicle. Our platform system is proving to be cheaper, faster and safer than older techniques and was developed alongside our construction team, Aspin Foundations, who were responsible for the installation.

Services Provided

  • Geotechnical Engineering
  • Site Investigation
  • Structural Engineering