Tameside Bridge

Project Overview

To allow a factory to take delivery of a new large piece of equipment weighing over 40 tonnes, we were asked to check that this bridge, being the only means of access, could carry the abnormal load. The 12-axle articulated lorry transporting the equipment also added further weight. Together with our sister company, RSI, we undertook a structural survey of the bridge and alongside our structural report and calculations we confirmed the bridge was strong enough, giving our client peace of mind.

Services Provided

  • Structural Engineering
  • Structural Survey