Project Overview

During bad weather the A372 in Somerset was often flooded for several weeks and occasionally required closing to accommodate emergency pumping. Within an ambitious timeframe we, together with our construction colleagues, designed and installed temporary and permanent works to allow any water to flow under the road rather than flood over it. These works ensure the road can remain open and journeys will be safer.

Services Provided

  • Geotechnical Engineering
  • Ground Investigation
  • Temporary Works